Work In Progress

Langar

An overhaul has taken place and go of the bells is much improved. There are issues with the sound level in the ringing room and these are being addressed – the use of Guild labour and a further grant towards this additional work are likely.

Widmerpool

There are plans to install a ring of six. So far the guild has helped remove four bells from a redundant church in Wales that are intended for use on this project. We are currently trying to find two more bells that fit in with what we have. A grant has been promised towards the cost of the work and Guild insured labour has also been promised.

Inspections

Wilford

An inspection has taken place and recommendations have been made. Minor works are needed to return all the bells to a ringable condition.